A complaint that a sidewalk shed or supported scaffold is inadequate, defective, missing, or lacks a permit or certificate.
Complaint23Apr 6, 2023Closed
A violation for failing to maintain the building's exterior walls or attached parts (its façade).
Violation104May 22, 2019Closed§ 28-302.1
A violation for failing to maintain the building's exterior walls or attached parts (its façade).
Violation204Jan 3, 2018Closed§ 28-302.1
A violation for failing to maintain the building's exterior walls or attached parts (its façade).
Violation204Oct 16, 2015Closed§ 28-302.1
A complaint that adjacent buildings are not being protected during construction.
Complaint03Jul 24, 2006Closed
A violation for failing to maintain the building's exterior wall (its façade).
ViolationB06Sep 17, 1999Closed§ 27-127
A ‘closed’ status means the city closed the case — it does not guarantee the issue was corrected.
Frequently asked questions
- How many structural / façade records does 9 MAIDEN LANE, MANHATTAN have on file?
- 6 structural / façade records are on file for 9 MAIDEN LANE, MANHATTAN from NYC Department of Buildings and HPD data.
- Where does this structural / façade data come from?
- Records come from the NYC Department of Buildings (DOB/ECB) and the Department of Housing Preservation and Development (HPD) via NYC Open Data, refreshed daily. InspectorCrib translates the official codes into plain English.