← Back to building

Structural / Façade

19 records on file for 120 FULTON STREET, MANHATTAN

A complaint that the building or a required system is not being properly maintained.
Complaint73Jul 5, 2017Closed
A complaint that the building or a required system is not being properly maintained.
Complaint73May 23, 2017Closed
A complaint that the building or a required system is not being properly maintained.
Complaint73Dec 12, 2016Closed
A complaint that the building is shaking or vibrating, or that its structural stability is affected.
Complaint30Apr 22, 2016Closed
A complaint that part of a building is falling or is in danger of falling.
Complaint10Feb 26, 2016Closed
A complaint that excavation is undermining an adjacent building.
Complaint14Feb 26, 2016Closed
A complaint that the building or a required system is not being properly maintained.
Complaint73Nov 5, 2015Closed
A complaint that adjacent buildings are not being protected during construction.
Complaint03Jul 29, 2015Closed
A complaint that adjacent buildings are not being protected during construction.
Complaint03May 16, 2015Closed
A complaint that the building or a required system is not being properly maintained.
Complaint73Apr 17, 2015Closed
A complaint that the building or a required system is not being properly maintained.
Complaint73Mar 18, 2015Closed
A complaint that part of a building is falling or is in danger of falling.
Complaint10Oct 16, 2013Closed
A complaint that adjacent buildings are not being protected during construction.
Complaint03Oct 16, 2013Closed
A complaint that part of a building is falling or is in danger of falling.
Complaint10Jun 3, 2011Closed
A complaint about unsafe, illegal, or mechanical demolition.
Complaint12Jul 9, 2003Closed
A violation for failing to maintain the building's exterior wall (its façade).
ViolationB06Mar 5, 2003Closed§ 27-127
A complaint that the building is shaking or vibrating, or that its structural stability is affected.
Complaint30Feb 28, 2003Closed
A complaint that part of a building is falling or is in danger of falling.
Complaint10May 21, 2002Closed
A complaint that the building or a required system is not being properly maintained.
Complaint73Mar 20, 1991Closed

A ‘closed’ status means the city closed the case — it does not guarantee the issue was corrected.

Frequently asked questions

How many structural / façade records does 120 FULTON STREET, MANHATTAN have on file?
19 structural / façade records are on file for 120 FULTON STREET, MANHATTAN from NYC Department of Buildings and HPD data.
Where does this structural / façade data come from?
Records come from the NYC Department of Buildings (DOB/ECB) and the Department of Housing Preservation and Development (HPD) via NYC Open Data, refreshed daily. InspectorCrib translates the official codes into plain English.