A violation for failing to maintain the building's exterior walls or attached parts (its façade).
Violation204Jan 11, 2023Active§ 28-302.1
A violation for failing to maintain the building's exterior walls or attached parts (its façade).
Violation204May 31, 2017Active§ 28-302.1
A complaint that the building or a required system is not being properly maintained.
Complaint73Sep 22, 2015Closed
A violation for failing to maintain the building's exterior walls or attached parts (its façade).
Violation204Sep 2, 2015Closed§ 28-302.1
A complaint that the building or a required system is not being properly maintained.
Complaint73Apr 11, 2008Closed
A complaint that the building or a required system is not being properly maintained.
Complaint73Sep 10, 1998Closed
A complaint that the building or a required system is not being properly maintained.
Complaint73Mar 19, 1998Closed
A complaint that the building or a required system is not being properly maintained.
Complaint73Feb 27, 1998Closed
A complaint that the building or a required system is not being properly maintained.
Complaint73Feb 27, 1998Closed
A ‘closed’ status means the city closed the case — it does not guarantee the issue was corrected.
Frequently asked questions
- How many structural / façade records does 35 VESTRY STREET, MANHATTAN have on file?
- 9 structural / façade records are on file for 35 VESTRY STREET, MANHATTAN from NYC Department of Buildings and HPD data, of which 2 are currently open.
- Where does this structural / façade data come from?
- Records come from the NYC Department of Buildings (DOB/ECB) and the Department of Housing Preservation and Development (HPD) via NYC Open Data, refreshed daily. InspectorCrib translates the official codes into plain English.