A complaint that the building is shaking or vibrating, or that its structural stability is affected.
Complaint30Apr 26, 2025Closed
A complaint that a sidewalk shed or supported scaffold is inadequate, defective, missing, or lacks a permit or certificate.
Complaint23Aug 31, 2022Closed
A complaint that adjacent buildings are not being protected during construction.
Complaint03Jan 26, 2022Closed
A complaint that a sidewalk shed or supported scaffold is inadequate, defective, missing, or lacks a permit or certificate.
Complaint23Nov 9, 2010Closed
A complaint that a sidewalk shed or supported scaffold is inadequate, defective, missing, or lacks a permit or certificate.
Complaint23Jul 10, 2009Closed
A complaint that a sidewalk shed or supported scaffold is inadequate, defective, missing, or lacks a permit or certificate.
Complaint23Jul 10, 2009Closed
A complaint that a sidewalk shed or supported scaffold is inadequate, defective, missing, or lacks a permit or certificate.
Complaint23Apr 27, 2009Closed
A ‘closed’ status means the city closed the case — it does not guarantee the issue was corrected.
Frequently asked questions
- How many structural / façade records does 20 E 9TH ST, MANHATTAN have on file?
- 7 structural / façade records are on file for 20 E 9TH ST, MANHATTAN from NYC Department of Buildings and HPD data.
- Where does this structural / façade data come from?
- Records come from the NYC Department of Buildings (DOB/ECB) and the Department of Housing Preservation and Development (HPD) via NYC Open Data, refreshed daily. InspectorCrib translates the official codes into plain English.