A complaint that a sidewalk shed or supported scaffold is inadequate, defective, missing, or lacks a permit or certificate.
Complaint23Apr 14, 2022Closed
A complaint that a sidewalk shed or supported scaffold is inadequate, defective, missing, or lacks a permit or certificate.
Complaint23May 12, 2020Closed
A violation for failing to maintain the building's exterior walls or attached parts (its façade).
Violation104Apr 28, 2020Closed§ 28-302.1
A violation for failing to maintain the building's exterior walls or attached parts (its façade).
Violation204Nov 3, 2011Closed§ 28-302.1
A complaint that a sidewalk shed or supported scaffold is inadequate, defective, missing, or lacks a permit or certificate.
Complaint23May 20, 2009Closed
A complaint that a sidewalk shed or supported scaffold is inadequate, defective, missing, or lacks a permit or certificate.
Complaint23May 19, 2008Closed
A ‘closed’ status means the city closed the case — it does not guarantee the issue was corrected.
Frequently asked questions
- How many structural / façade records does 140 5TH AVE, MANHATTAN have on file?
- 6 structural / façade records are on file for 140 5TH AVE, MANHATTAN from NYC Department of Buildings and HPD data.
- Where does this structural / façade data come from?
- Records come from the NYC Department of Buildings (DOB/ECB) and the Department of Housing Preservation and Development (HPD) via NYC Open Data, refreshed daily. InspectorCrib translates the official codes into plain English.