← Back to building

Structural / Façade

9 records on file for 101 MADISON AVENUE, MANHATTAN

A complaint that a sidewalk shed or supported scaffold is inadequate, defective, missing, or lacks a permit or certificate.
Complaint23Sep 8, 2023Closed
A complaint that a sidewalk shed or supported scaffold is inadequate, defective, missing, or lacks a permit or certificate.
Complaint23Aug 1, 2023Closed
A violation for failing to maintain the building's exterior walls or attached parts (its façade).
Violation204Feb 15, 2019Closed§ 28-302.1
A complaint that part of a building is falling or is in danger of falling.
Complaint10Oct 5, 2018Closed
A violation for failing to maintain the building's exterior walls or attached parts (its façade).
Violation204Nov 14, 2017Closed§ 28-302.1
A complaint that the building is shaking or vibrating, or that its structural stability is affected.
Complaint30Apr 29, 2016Closed
A complaint that part of a building is falling or is in danger of falling.
Complaint10Jun 19, 2006Closed
A complaint that the building or a required system is not being properly maintained.
Complaint73Oct 24, 1991Closed
A complaint that the building or a required system is not being properly maintained.
Complaint73Oct 24, 1991Closed

A ‘closed’ status means the city closed the case — it does not guarantee the issue was corrected.

Frequently asked questions

How many structural / façade records does 101 MADISON AVENUE, MANHATTAN have on file?
9 structural / façade records are on file for 101 MADISON AVENUE, MANHATTAN from NYC Department of Buildings and HPD data.
Where does this structural / façade data come from?
Records come from the NYC Department of Buildings (DOB/ECB) and the Department of Housing Preservation and Development (HPD) via NYC Open Data, refreshed daily. InspectorCrib translates the official codes into plain English.