A complaint that adjacent buildings are not being protected during construction.
Complaint03Aug 5, 2022Closed
A complaint that a wall or retaining wall is bulging or cracked.
Complaint54Aug 4, 2014Closed
A complaint that the building is shaking or vibrating, or that its structural stability is affected.
Complaint30Jun 18, 2014Closed
A complaint that the building or a required system is not being properly maintained.
Complaint73Jun 11, 2014Closed
A complaint that the building or a required system is not being properly maintained.
Complaint73May 23, 2014Closed
A complaint that the building or a required system is not being properly maintained.
Complaint73Dec 7, 2000Closed
A ‘closed’ status means the city closed the case — it does not guarantee the issue was corrected.
Frequently asked questions
- How many structural / façade records does 251 WEST 72ND STREET, MANHATTAN have on file?
- 6 structural / façade records are on file for 251 WEST 72ND STREET, MANHATTAN from NYC Department of Buildings and HPD data.
- Where does this structural / façade data come from?
- Records come from the NYC Department of Buildings (DOB/ECB) and the Department of Housing Preservation and Development (HPD) via NYC Open Data, refreshed daily. InspectorCrib translates the official codes into plain English.