A complaint that the building's structural stability is affected.
Complaint43Aug 1, 1997Closed
A complaint that a wall or retaining wall is bulging or cracked.
Complaint54Apr 12, 1995Closed
A complaint that the building or a required system is not being properly maintained.
Complaint73Jan 11, 1990Closed
A ‘closed’ status means the city closed the case — it does not guarantee the issue was corrected.
Frequently asked questions
- How many structural / façade records does 209 EAST 5TH ST, MANHATTAN have on file?
- 3 structural / façade records are on file for 209 EAST 5TH ST, MANHATTAN from NYC Department of Buildings and HPD data.
- Where does this structural / façade data come from?
- Records come from the NYC Department of Buildings (DOB/ECB) and the Department of Housing Preservation and Development (HPD) via NYC Open Data, refreshed daily. InspectorCrib translates the official codes into plain English.