A complaint that the building or a required system is not being properly maintained.
Complaint73May 28, 2025Closed
A complaint that adjacent buildings are not being protected during construction.
Complaint03May 12, 2025Closed
A complaint that the building or a required system is not being properly maintained.
Complaint73Apr 9, 2025Closed
A complaint that adjacent buildings are not being protected during construction.
Complaint03Apr 8, 2025Closed
A violation for failing to maintain the building's exterior walls or attached parts (its façade).
Violation204Feb 14, 2018Closed§ 28-302.1
A ‘closed’ status means the city closed the case — it does not guarantee the issue was corrected.
Frequently asked questions
- How many structural / façade records does 118 EAST 59 STREET, MANHATTAN have on file?
- 5 structural / façade records are on file for 118 EAST 59 STREET, MANHATTAN from NYC Department of Buildings and HPD data.
- Where does this structural / façade data come from?
- Records come from the NYC Department of Buildings (DOB/ECB) and the Department of Housing Preservation and Development (HPD) via NYC Open Data, refreshed daily. InspectorCrib translates the official codes into plain English.