A complaint that a sidewalk shed or supported scaffold is inadequate, defective, missing, or lacks a permit or certificate.
Complaint23Nov 29, 2022Closed
A complaint that the building or a required system is not being properly maintained.
Complaint73Nov 29, 2022Closed
A violation for failing to maintain the building's exterior wall (its façade).
ViolationB06Dec 4, 2000Closed§ 27-127
A complaint that part of a building is falling or is in danger of falling.
Complaint10Dec 4, 2000Closed
A complaint that the building or a required system is not being properly maintained.
Complaint73Dec 4, 2000Closed
A complaint that the building's structural stability is affected.
Complaint43Jul 1, 1997Closed
A ‘closed’ status means the city closed the case — it does not guarantee the issue was corrected.
Frequently asked questions
- How many structural / façade records does 2265 MORRIS AVENUE, BRONX have on file?
- 6 structural / façade records are on file for 2265 MORRIS AVENUE, BRONX from NYC Department of Buildings and HPD data.
- Where does this structural / façade data come from?
- Records come from the NYC Department of Buildings (DOB/ECB) and the Department of Housing Preservation and Development (HPD) via NYC Open Data, refreshed daily. InspectorCrib translates the official codes into plain English.