A complaint that a wall or retaining wall is bulging or cracked.
Complaint54Feb 28, 2024Closed
A complaint that a wall or retaining wall is bulging or cracked.
Complaint54Dec 30, 2023Closed
A violation for failing to maintain the building's exterior walls or attached parts (its façade).
Violation204Mar 13, 2013Closed§ 28-302.1
A violation for failing to maintain the building's exterior walls or attached parts (its façade).
Violation204Mar 14, 2011Closed§ 28-302.1
A ‘closed’ status means the city closed the case — it does not guarantee the issue was corrected.
Frequently asked questions
- How many structural / façade records does 529 EAST 235 STREET, BRONX have on file?
- 4 structural / façade records are on file for 529 EAST 235 STREET, BRONX from NYC Department of Buildings and HPD data.
- Where does this structural / façade data come from?
- Records come from the NYC Department of Buildings (DOB/ECB) and the Department of Housing Preservation and Development (HPD) via NYC Open Data, refreshed daily. InspectorCrib translates the official codes into plain English.