A complaint that the building or a required system is not being properly maintained.
Complaint73Nov 21, 2024Closed
A violation for failing to maintain the building's exterior walls or attached parts (its façade).
Violation104Feb 7, 2019Closed§ 28-302.1
A violation for failing to maintain the building's exterior walls or attached parts (its façade).
Violation104Dec 19, 2018Closed§ 28-302.1
A violation for failing to maintain the building's exterior walls or attached parts (its façade).
Violation104Oct 31, 2018Closed§ 28-302.1
A violation for failing to maintain the building's exterior walls or attached parts (its façade).
Violation104Sep 14, 2018Closed§ 28-302.1
A violation for failing to maintain the building's exterior walls or attached parts (its façade).
Violation104Jun 21, 2018Closed§ 28-302.1
A complaint that the building is shaking or vibrating, or that its structural stability is affected.
Complaint30Jun 20, 2018Closed
A complaint that the building is shaking or vibrating, or that its structural stability is affected.
Complaint30Apr 23, 2018Closed
A complaint that the building is shaking or vibrating, or that its structural stability is affected.
Complaint30Apr 7, 2013Closed
A complaint that adjacent buildings are not being protected during construction.
Complaint03Jun 27, 2012Closed
A complaint that the building's structural stability is affected.
Complaint43Aug 26, 1997Closed
A ‘closed’ status means the city closed the case — it does not guarantee the issue was corrected.
Frequently asked questions
- How many structural / façade records does 900 MORRIS PARK AVENUE, BRONX have on file?
- 11 structural / façade records are on file for 900 MORRIS PARK AVENUE, BRONX from NYC Department of Buildings and HPD data.
- Where does this structural / façade data come from?
- Records come from the NYC Department of Buildings (DOB/ECB) and the Department of Housing Preservation and Development (HPD) via NYC Open Data, refreshed daily. InspectorCrib translates the official codes into plain English.