A violation for failing to maintain the building's exterior walls or attached parts (its façade).
Violation204Aug 14, 2025Active§ 28-302.1
A complaint that part of a building is falling or is in danger of falling.
Complaint10Aug 13, 2024Closed
A complaint that a sidewalk shed or supported scaffold is inadequate, defective, missing, or lacks a permit or certificate.
Complaint23Jun 12, 2020Closed
A violation for failing to maintain the building's exterior walls or attached parts (its façade).
Violation204Dec 27, 2019Closed§ 28-302.1
A complaint that adjacent buildings are not being protected during construction.
Complaint03Sep 8, 2007Closed
A complaint that the building or a required system is not being properly maintained.
Complaint73Sep 23, 2004Closed
A ‘closed’ status means the city closed the case — it does not guarantee the issue was corrected.
Frequently asked questions
- How many structural / façade records does 383 PULASKI STREET, BROOKLYN have on file?
- 6 structural / façade records are on file for 383 PULASKI STREET, BROOKLYN from NYC Department of Buildings and HPD data, of which 1 is currently open.
- Where does this structural / façade data come from?
- Records come from the NYC Department of Buildings (DOB/ECB) and the Department of Housing Preservation and Development (HPD) via NYC Open Data, refreshed daily. InspectorCrib translates the official codes into plain English.