A violation for failing to maintain the building's exterior walls or attached parts (its façade).
Violation104Jul 29, 2020Closed§ 28-302.1
A complaint that a wall or retaining wall is bulging or cracked.
Complaint54Jul 24, 2020Closed
A complaint that the building or a required system is not being properly maintained.
Complaint73Oct 10, 2003Closed
A complaint that the building or a required system is not being properly maintained.
Complaint73Jul 25, 2001Closed
A complaint that a wall or retaining wall is bulging or cracked.
Complaint54Jun 3, 1998Closed
A complaint that a wall or retaining wall is bulging or cracked.
Complaint54Oct 6, 1997Closed
A ‘closed’ status means the city closed the case — it does not guarantee the issue was corrected.
Frequently asked questions
- How many structural / façade records does 315 61 STREET, BROOKLYN have on file?
- 6 structural / façade records are on file for 315 61 STREET, BROOKLYN from NYC Department of Buildings and HPD data.
- Where does this structural / façade data come from?
- Records come from the NYC Department of Buildings (DOB/ECB) and the Department of Housing Preservation and Development (HPD) via NYC Open Data, refreshed daily. InspectorCrib translates the official codes into plain English.