A complaint that adjacent buildings are not being protected during construction.
Complaint03Jul 27, 2008Closed
A complaint that the building or a required system is not being properly maintained.
Complaint73Mar 19, 2007Closed
A complaint that a wall or retaining wall is bulging or cracked.
Complaint54Jun 7, 2006Closed
A complaint that the building or a required system is not being properly maintained.
Complaint73Jul 8, 1998Closed
A ‘closed’ status means the city closed the case — it does not guarantee the issue was corrected.
Frequently asked questions
- How many structural / façade records does 106 BAY 10 STREET, BROOKLYN have on file?
- 4 structural / façade records are on file for 106 BAY 10 STREET, BROOKLYN from NYC Department of Buildings and HPD data.
- Where does this structural / façade data come from?
- Records come from the NYC Department of Buildings (DOB/ECB) and the Department of Housing Preservation and Development (HPD) via NYC Open Data, refreshed daily. InspectorCrib translates the official codes into plain English.