A violation for failing to maintain the building's exterior wall (its façade).
ViolationB06Nov 17, 2006Active§ 27-127
A complaint that the building or a required system is not being properly maintained.
Complaint73Nov 14, 2006Closed
A complaint that a wall or retaining wall is bulging or cracked.
Complaint54Aug 29, 2006Closed
A ‘closed’ status means the city closed the case — it does not guarantee the issue was corrected.
Frequently asked questions
- How many structural / façade records does 160-31 CROSS BAY BOULEVARD, QUEENS have on file?
- 3 structural / façade records are on file for 160-31 CROSS BAY BOULEVARD, QUEENS from NYC Department of Buildings and HPD data, of which 1 is currently open.
- Where does this structural / façade data come from?
- Records come from the NYC Department of Buildings (DOB/ECB) and the Department of Housing Preservation and Development (HPD) via NYC Open Data, refreshed daily. InspectorCrib translates the official codes into plain English.